New stone countertops are one of the biggest upgrades you can make to a kitchen, and knowing what happens at each stage takes the stress out of the project. Here’s how a typical granite or quartz countertop job works, from first call to the day you start cooking again.

Step 1: Free Estimate and Material Selection

It starts with a conversation about your space, your style and your budget. We’ll talk through granite vs. quartz, colors, edge profiles and sink options, and give you a written estimate. Many homeowners like to preview colors first with our kitchen visualizer.

If you’re choosing granite, we recommend seeing the actual slab. Natural stone varies from slab to slab, and picking yours means no surprises.

Step 2: Templating (Precise Measuring)

Once your material is chosen, we come out to template. This is a precise digital or physical measurement of every cabinet run, corner, wall and appliance opening. It’s what makes stone fit perfectly, since walls in real houses are rarely perfectly straight.

Before templating:

  • Base cabinets should be fully installed, level and secured.
  • Have your sink, faucet and cooktop selected (and ideally on site) so cutouts are exact.
  • Clear the countertops and the area around the cabinets.
  • Remove old countertops beforehand if they aren’t part of your replacement job.

Step 3: Fabrication

Your slab is cut to the template, the edge profile is shaped and polished, and sink and cooktop cutouts are made. This is where custom details like a decorative edge or an undermount sink come to life. Learn more about our countertop fabrication.

Fabrication time depends on the material and the shop schedule. We’ll give you a timeline when you approve your estimate.

Step 4: Installation Day

Most residential kitchen installs are completed in a single day. On install day our crew will:

  1. Carry in and dry-fit each piece.
  2. Secure the countertops to the cabinets.
  3. Mount undermount sinks.
  4. Join and color-match any seams so they’re as tight and unnoticeable as possible.
  5. Clean up and walk you through the finished job.

Stone slabs are heavy, so please keep kids and pets out of the work area and clear a path from the driveway to the kitchen.

Step 5: Plumbing and Finishing Touches

After installation, your plumber reconnects the sink, faucet and disposal, and appliances like cooktops and slide-in ranges are set back in place. Backsplash tile can be installed once the countertops are in.

Ask your installer how long to wait before reconnecting plumbing or applying heavy weight, as adhesives and seam fillers need time to cure.

Step 6: Sealing and Care

Granite should be sealed to protect against stains, and quartz never needs sealing. Our care guide covers daily cleaning and when to reseal.

Frequently Asked Questions

Do I need to be home on install day?

It’s best if an adult is home at the start to confirm placement and at the end for the walkthrough.

Can I use my kitchen during the project?

You can use it normally until install day. Plan on the kitchen sink being out of service until your plumber reconnects it.

What if my old countertops are still in place?

We can remove and dispose of them as part of a countertop replacement.

Ready to get started? Marble and Granite Express handles everything from template to install for homeowners in Wayne, Westland, Garden City, Romulus, Belleville and nearby. Request a free estimate or call (734) 772-4431.